G02400 - SEMI G24 - Test Method for Measuring the Lead-to-Lead and Loading Capacitance of Package Leads Revision:SEMI G24-89 (Reapproved 0811) - Inactive Because the zero point on
$193.00
Description
Because the zero point on the z-axis is application specific
This Standard was technically approved by the Photovoltaic - Materials Global Technical Committee
本スタンダードでは,
contamination arising in its manufacture
G02400 - SEMI G24 - Test Method for Measuring the Lead-to-Lead and Loading Capacitance of Package Leads Revision:SEMI G24-89 (Reapproved 0811) - Inactive Because the zero point onThis Standard was technically approved by the global Assembly & Packaging Technical Committee. This edition was approved for publication by the global Audits and Reviews Subcommittee on July 1, 2011. Available at www. semiviews. org and www. semi. org in August 2011; originally published in 1984; previously published in 1989. This Document defines the equipment, materials, and procedures used to measure the lead to lead and loading capacitance of
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 475.00
US$ 16.99
US$ 499.50
US$ 475.00
US$ 43.99
US$ 499.50
US$ 650.00