C108 Built-up walls: Loads and structural performance 1999 Field testing of filled-cavity wall
$264.48
Description
Field testing of filled-cavity wall systems
CWCT Member Price: £50
Glass removal
storage and installation and maintenance
C108 Built-up walls: Loads and structural performance 1999 Field testing of filled-cavity wallOutline: Built up walls are a layered form of facade construction typically comprising a structural back wall and a rainscreen or insulated render cladding. This course discusses various aspects of structural performance, loading and movement, and identifies key British, European and CWCT standards and guides relevant to these issues. This course has a significant engineering content. Target Audience: This course is aimed at those with an interest in
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.