Non-Recurring Engineering Charge (NRE) Full-Size Long Flatbed The MultiPlus-II can be used
$1250.00
Description
The MultiPlus-II can be used in off grid as well as grid connected PV and other alternative energy systems
The outlet hose can be removed with a quick-release valve equipped with an auto shut-off
Dometic CFX3 95DZ × 1
1"H Flatbed Overland Trailer Chassis Build with detachable drop sides and Australian Jacks
Non-Recurring Engineering Charge (NRE) Full-Size Long Flatbed The MultiPlus-II can be usedA non recurring engineering or NRE charge is for customers that require design work for a project, but do not leave tangible collateral at The Next Jump HQ to work from. This is for proof of concept design work. Not the final cost of the project. Hard costs will be added once the customer approves the proof of concept design and added to the bill of materials (BOM) for the project once the design is approved..
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 26.92
US$ 13.46
US$ 11.50
US$ 24.18